United Kingdom
Aggreko Provides drying solutions to get Cheltenham Leisure centre back into action following the floods in 2007
Auxiliary power combination for cargo ship
Aggreko provided temperature control solutions for Alabama Grocery Distributor
This hugely high profile event required absolute reliability and meticulous planning.
Tunnelling conditions in this time sensitive motorway project were causing difficulty.
Amsterdam’s Schiphol Airport underwent a massive renovation project to increase its passenger capacity.
Technical problems with on-board generators in this Gulf of Mexico based rig meant emergency shut-down.
Muscat City Centre Hypermarket needed up to four MW of reliable electrical power delivered at 11 kV.
An enormous electrically powered open cast excavator needed to move 25 miles from one mine to another.
A container ship en route between Singapore and Los Angeles required an additional back-up generator with its own fuel supply.