Case Study Archive

Drying solutions for Cheltenham Leisure Centre after floods 2007

Aggreko Provides drying solutions to get Cheltenham Leisure centre back into action following the floods in 2007

Generator combo keeps ship at sea

Auxiliary power combination for cargo ship

Alabama Food distributor

Aggreko provided temperature control solutions for Alabama Grocery Distributor

Aggreko chosen to power the 55th Presidential inauguration

This hugely high profile event required absolute reliability and meticulous planning.

Aggreko ensures the best possible finish for a tunnel

Tunnelling conditions in this time sensitive motorway project were causing difficulty.

Schiphol Airport relies on Aggreko to keep cool during expansion

Amsterdam’s Schiphol Airport underwent a massive renovation project to increase its passenger capacity.

Aggreko provides emergency power to a Gulf Rig

Technical problems with on-board generators in this Gulf of Mexico based rig meant emergency shut-down.

Muscat City Centre Hypermarket relies on Aggreko

Muscat City Centre Hypermarket needed up to four MW of reliable electrical power delivered at 11 kV.

Aggreko powers a monster excavator for 25 miles

An enormous electrically powered open cast excavator needed to move 25 miles from one mine to another.

Aggreko provides power and fuel tanks for container ship

A container ship en route between Singapore and Los Angeles required an additional back-up generator with its own fuel supply.