Turning challenges into profit
Aggreko has solutions to assist you in turning the challenges in
the construction industry into profit.
Reduce dead time with Aggreko's
Heating and Drying solutions

Using our range of dehumidifiers to accelerate the drying process
enables contractors to complete work sooner and reduce
dead time.
Combined with our fume free oil fired or electric heaters the
effects of the wet weather can be overcome.
Typical
applications:
Aggreko's range of heaters and dehumidifiers can be used to optimise
drying times to ensure the best quality finish in the least
amount of time.
Damp weather can increase concrete curing time, heating and
drying solutions from Aggreko can eliminate the issues associated
with damp weather and provide the optimum drying conditions to
ensure a flawless finish whatever the weather.
During building preservation and renovation damp and cold
weather can adversely affect the building structure.
Aggreko's moisture control solutions use a combination
of heaters and dehumidifiers to provide stable conditions
inside buildings, reducing the risk of damp and mould
delaying preservation and renovation work.
-
Wood and veneer stabalisation and Vinyl floor laying
Flooring contractors are fully aware of the
importance of correct amibient conditions when laying wood or
veneered flooring. By maintaining the correct levels of humidity in
the building Aggreko can help ensure that flooring contractors get
a perfect finish every time. Localised heating can be provided to
ease the process of laying vinyl floors along with associated
dehumidification equipment to keep the correct moisture levels
during the floor fitting process.
Localised heating can be provided via Aggreko's portable
electric heaters. Alternatively where required a complete temporary heating system can be installed using a
range of fume free indirect oil fired heaters and air handlers.
Aggreko's extensive fleet of generators, fuel tanks and distribution
equipment, ensures that whatever the size of your project
Aggreko can help you to stay on target and on budget to ensure you
are able to turn the challenges of the construction industry into
profits for you.
Our National Rental Centre
based in Staffordshire operates 24/7 365 days a year ensuring
Aggreko is always on hand to help you.
08458 24 7
365